Lanran’s BPED System Achieves Stable Operation at High-Altitude Lithium Salt Lake Project in Xizang

In May 2026, Lanran’s Bipolar Membrane Electrodialysis (BPED) resource recovery system successfully commenced operation at the Mami Co Salt Lake lithium project in Ngari, Xizang, at an altitude of 4,480 meters. Following system commissioning and process optimization, the plant has…



